YYÜ GCRIS Basic veritabanının içerik oluşturulması ve kurulumu Research Ecosystems (https://www.researchecosystems.com) tarafından devam etmektedir. Bu süreçte gördüğünüz verilerde eksikler olabilir.
 

Slope Stability Problems and Back Analysis in Heavily Jointed Rock Mass: a Case Study From Manisa, Turkey

dc.authorid Akin, Mutluhan/0000-0002-5752-6949
dc.authorscopusid 35361586200
dc.authorwosid Akin, Mutluhan/A-7969-2010
dc.contributor.author Akin, Mutluhan
dc.date.accessioned 2025-05-10T17:44:41Z
dc.date.available 2025-05-10T17:44:41Z
dc.date.issued 2013
dc.department T.C. Van Yüzüncü Yıl Üniversitesi en_US
dc.department-temp Yuzuncu Yil Univ, Dept Min Engn, TR-65080 Van, Turkey en_US
dc.description Akin, Mutluhan/0000-0002-5752-6949 en_US
dc.description.abstract This paper presents a case study regarding slope stability problems and the remedial slope stabilization work executed during the construction of two reinforced concrete water storage tanks on a steep hill in Manisa, Turkey. Water storage tanks of different capacities were planned to be constructed, one under the other, on closely jointed and deformed shale and sandstone units. The tank on the upper elevation was constructed first and an approximately 20-m cut slope with two benches was excavated in front of this upper tank before the construction of the lower tank. The cut slope failed after a week and the failure threatened the stability of the upper water tank. In addition to re-sloping, a 15.6-m deep contiguous retaining pile wall without anchoring was built to support both the cut slope and the upper tank. Despite the construction of a retaining pile wall, a maximum of 10 mm of displacement was observed by inclinometer measurements due to the re-failure of the slope on the existing slip surface. Permanent stability was achieved after the placement of a granular fill buttress on the slope. Back analysis based on the non-linear (Hoek-Brown) failure criterion indicated that the geological strength index (GSI) value of the slope-forming material is around 21 and is compatible with the in situ-determined GSI value (24). The calculated normal-shear stress plots are also consistent with the Hoek-Brown failure envelope of the rock mass, indicating that the location of the sliding surface, GSI value estimated by back analysis, and the rock mass parameters are well defined. The long-term stability analysis illustrates a safe slope design after the placement of a permanent toe buttress. en_US
dc.description.woscitationindex Science Citation Index Expanded
dc.identifier.doi 10.1007/s00603-012-0262-x
dc.identifier.endpage 371 en_US
dc.identifier.issn 0723-2632
dc.identifier.issn 1434-453X
dc.identifier.issue 2 en_US
dc.identifier.scopus 2-s2.0-84879417762
dc.identifier.scopusquality Q1
dc.identifier.startpage 359 en_US
dc.identifier.uri https://doi.org/10.1007/s00603-012-0262-x
dc.identifier.uri https://hdl.handle.net/20.500.14720/16119
dc.identifier.volume 46 en_US
dc.identifier.wos WOS:000314722100011
dc.identifier.wosquality Q1
dc.institutionauthor Akin, Mutluhan
dc.language.iso en en_US
dc.publisher Springer Wien en_US
dc.relation.publicationcategory Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject Slope Stability en_US
dc.subject Back Analysis en_US
dc.subject Gsi en_US
dc.subject Non-Linear Failure Criterion en_US
dc.subject Water Storage Tank en_US
dc.subject Heavily Jointed Rock Mass en_US
dc.subject Retaining Pile Wall en_US
dc.subject Block Punch Index Test en_US
dc.title Slope Stability Problems and Back Analysis in Heavily Jointed Rock Mass: a Case Study From Manisa, Turkey en_US