A Comparative Study of Modeling and Solution Approaches for the Multi-Mode Resource-Constrained Discrete Time-Cost Trade-Off Problem: Case Study of an Erp Implementation Project

dc.authorid Topaloglu Yildiz, Seyda/0000-0001-6827-126X
dc.authorscopusid 57315902300
dc.authorscopusid 44061847100
dc.authorscopusid 56228117300
dc.authorscopusid 52263627900
dc.authorscopusid 57715592500
dc.authorwosid Hamzadayi, Alper/G-3218-2019
dc.authorwosid Subulan, Kemal/P-2090-2019
dc.authorwosid Topaloglu, Şeyda/Aab-3269-2021
dc.contributor.author Cakir, Gizem
dc.contributor.author Subulan, Kemal
dc.contributor.author Yildiz, Seyda Topaloglu
dc.contributor.author Hamzadayi, Alper
dc.contributor.author Asilkefeli, Ceren
dc.date.accessioned 2025-05-10T17:36:28Z
dc.date.available 2025-05-10T17:36:28Z
dc.date.issued 2022
dc.department T.C. Van Yüzüncü Yıl Üniversitesi en_US
dc.department-temp [Cakir, Gizem; Asilkefeli, Ceren] Dokuz Eylul Univ, Grad Sch Nat & Appl Sci, Izmir, Turkey; [Subulan, Kemal; Yildiz, Seyda Topaloglu] Dokuz Eylul Univ, Fac Engn, Dept Ind Engn, Izmir, Turkey; [Hamzadayi, Alper] Van Yuzuncu Yil Univ, Dept Ind Engn, Van, Turkey en_US
dc.description Topaloglu Yildiz, Seyda/0000-0001-6827-126X en_US
dc.description.abstract Most knowledge-intensive industries, especially companies developing software engineering projects such as Enterprise Resource Planning (ERP) implementation projects, generally necessitate finding the optimal trade-off between the project duration and total usage cost of the renewable resource costs (e.g., human resource expertise costs). Therefore, the MRC-DTCTP, which integrates classical multi-mode resource-constrained project scheduling (MRCPSP) and discrete time-cost trade-off problems (DTCTP), can be seen as a more applicable problem since it better reflects the objectives and requirements of today's real-life software project applications. The MRC-DTCTP is a much more complex variant of the MRCPSP since it aims to minimize total direct/indirect costs of the resources simultaneously under a pre-specified project deadline. Based on this motivation, a new explicit integer-linear programming (ILP) model of the MRC-DTCTP was first developed based on the implicit non-linear programming model of Wuliang and Chengen (2009). Due to its NP-hard nature, we also proposed a constraint programming (CP) model that includes several search strategies to solve large-sized problem instances within reasonable computation time. In addition, a genetic algorithm (GA) approach in combination with a Modified Serial Schedule Generation scheme (SSGS) is implemented to make further comparisons on several benchmark instances, which are generated based on the existing MRCPSP data sets taken from the project scheduling problem library (PSPLIB) by considering additional problem characteristics. A comprehensive experimental study has shown that the proposed CP model and GA approach can provide superior results in shorter run times for large-sized benchmark instances. Finally, an international Enterprise Resource Planning (ERP) Software Company's real-life application is presented. The ERP projects generally necessitate finding the optimal trade-off between project makespan and human resource costs, making the MRC-DTCTP much more difficult than classical MRCPSPs & DTCTPs. For further analysis, time-cost trade-off curves under different human resource avail abilities and project deadlines are drawn to provide managerial insights to ERP project managers. en_US
dc.description.woscitationindex Science Citation Index Expanded
dc.identifier.doi 10.1016/j.cie.2022.108201
dc.identifier.issn 0360-8352
dc.identifier.issn 1879-0550
dc.identifier.scopus 2-s2.0-85130974183
dc.identifier.scopusquality Q1
dc.identifier.uri https://doi.org/10.1016/j.cie.2022.108201
dc.identifier.uri https://hdl.handle.net/20.500.14720/14098
dc.identifier.volume 169 en_US
dc.identifier.wos WOS:000806821500010
dc.identifier.wosquality Q1
dc.language.iso en en_US
dc.publisher Pergamon-elsevier Science Ltd en_US
dc.relation.publicationcategory Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject Multi-Mode Resource-Constrained Discrete en_US
dc.subject Time-Cost Tradeoff Problem en_US
dc.subject Constraint Programming en_US
dc.subject Integer-Linear Programming en_US
dc.subject Genetic Algorithm en_US
dc.subject Erp Implementation Projects en_US
dc.title A Comparative Study of Modeling and Solution Approaches for the Multi-Mode Resource-Constrained Discrete Time-Cost Trade-Off Problem: Case Study of an Erp Implementation Project en_US
dc.type Article en_US