Event Driven Strategy Based Complete Rescheduling Approaches for Dynamic M Identical Parallel Machines Scheduling Problem With a Common Server

dc.contributor.author Hamzadayi, Alper
dc.contributor.author Yildiz, Gokalp
dc.date.accessioned 2025-05-10T17:40:14Z
dc.date.available 2025-05-10T17:40:14Z
dc.date.issued 2016
dc.description.abstract This paper addresses the dynamic m identical parallel machine scheduling problem in which the sequence dependent setup operations between the jobs are performed by a single server. An event driven rescheduling strategy based simulation optimization model is proposed by inspiration from limited order release procedure (Bergamaschi, Cigolini, Perona, & Portioli, 1997) for being able to tackle the changing environment of the system. The proposed event driven rescheduling strategy is based on the logic of controlling the level of the physical work-in-process on the shop floor. A simulated annealing and dispatching rules based complete rescheduling approaches as the simulation based optimization tools are proposed and adapted to the developed simulation model for generating new schedules depending on the proposed event driven rescheduling strategy. The objective of this study is to minimize the length of schedule (makespan). The performances of the approaches are compared on a hypothetical simulation case. The results of the extensive simulation study indicate that simulated annealing based complete rescheduling approach produces better scheduling performance. (C) 2015 Elsevier Ltd. All rights reserved. en_US
dc.identifier.doi 10.1016/j.cie.2015.11.005
dc.identifier.issn 0360-8352
dc.identifier.issn 1879-0550
dc.identifier.scopus 2-s2.0-84948179140
dc.identifier.uri https://doi.org/10.1016/j.cie.2015.11.005
dc.identifier.uri https://hdl.handle.net/20.500.14720/15130
dc.language.iso en en_US
dc.publisher Pergamon-elsevier Science Ltd en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject Dynamic Scheduling en_US
dc.subject M Identical Parallel Machines Scheduling With A Common Server en_US
dc.subject Simulation en_US
dc.subject Simulated Annealing en_US
dc.subject Dispatching Rules en_US
dc.subject Sequence Dependent Setup Times en_US
dc.title Event Driven Strategy Based Complete Rescheduling Approaches for Dynamic M Identical Parallel Machines Scheduling Problem With a Common Server en_US
dc.type Article en_US
dspace.entity.type Publication
gdc.author.scopusid 52263627900
gdc.author.scopusid 14920145400
gdc.author.wosid Hamzadayi, Alper/G-3218-2019
gdc.author.wosid Yildiz, Gokalp/O-7153-2019
gdc.coar.access metadata only access
gdc.coar.type text::journal::journal article
gdc.description.department T.C. Van Yüzüncü Yıl Üniversitesi en_US
gdc.description.departmenttemp [Hamzadayi, Alper] Yuzuncu Yil Univ, Dept Ind Engn, TR-65080 Van, Turkey; [Yildiz, Gokalp] Dokuz Eylul Univ, Dept Ind Engn, TR-35397 Izmir, Turkey en_US
gdc.description.endpage 84 en_US
gdc.description.publicationcategory Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı en_US
gdc.description.scopusquality Q1
gdc.description.startpage 66 en_US
gdc.description.volume 91 en_US
gdc.description.woscitationindex Science Citation Index Expanded
gdc.description.wosquality Q1
gdc.identifier.wos WOS:000368953600006
gdc.index.type WoS
gdc.index.type Scopus

Files